📊 MVP Implementation Progress

my.experimenta.science

Last Updated: 2025-10-30 Overall Progress: 21/137 tasks (15.3%) Current Phase: Phase 2 - Database (Completed)


🎯 Quick Status

Phase Status Progress Started Completed
01 Foundation Done 9/10 (90%) 2025-10-29 2025-10-29
02 Database Done 12/12 (100%) 2025-10-30 2025-10-30
03 Authentication Todo 0/18 (0%) - -
04 Products Todo 0/10 (0%) - -
05 Cart Todo 0/12 (0%) - -
06 Checkout Todo 0/15 (0%) - -
07 Payment Todo 0/12 (0%) - -
08 Order Processing Todo 0/15 (0%) - -
09 ERP Integration Todo 0/10 (0%) - -
10 i18n Todo 0/8 (0%) - -
11 Testing & Deployment Todo 0/15 (0%) - -

Legend: Todo | 🔄 In Progress | Done | 🚫 Blocked | ⏭️ Skipped


🚀 Current Work

Phase: Phase 2 - Database COMPLETED

Tasks Completed (12/12):

  • Install Drizzle ORM & PostgreSQL driver
  • Configure drizzle.config.ts
  • Add database scripts to package.json
  • Create users table schema
  • Create products table schema
  • Create carts table schema
  • Create cart_items table schema
  • Create orders table schema
  • Create order_items table schema
  • Generate initial migration
  • Apply migrations to dev database
  • Create database connection utility (server/utils/db.ts)
  • Test CRUD operations
  • Setup Drizzle Studio
  • Document schema decisions (comprehensive comments added)

Next Steps:

  1. Begin Phase 3 - Authentication (Cidaas OAuth2):
    • Read tasks/03-authentication.md
    • Review docs/CIDAAS_INTEGRATION.md for complete OAuth2 implementation guide
    • Install nuxt-auth-utils and jose
    • Implement OAuth2 Authorization Code Flow with PKCE
    • Create login/register/logout endpoints
    • Build auth UI components

📅 Timeline

Week 1 (Target)

  • Phase 1: Foundation COMPLETED 2025-10-29
  • Phase 2: Database COMPLETED 2025-10-30
  • Phase 3: Authentication

Week 2 (Target)

  • Phase 4: Products
  • Phase 5: Cart
  • Phase 6: Checkout

Week 3 (Target)

  • Phase 7: Payment
  • Phase 8: Order Processing
  • Phase 9: ERP Integration

Week 4 (Target)

  • Phase 10: i18n
  • Phase 11: Testing & Deployment
  • MVP Launch 🎉

🚧 Blockers

None currently. All blockers resolved.


📝 Decisions Needed

None currently.


Completed Milestones

  • Planning & Documentation (PRD, Architecture, Tech Stack)
  • Docker Development Setup (docker-compose.dev.yml)
  • Task Management System Setup
  • Phase 1 - Foundation (2025-10-29)
    • Nuxt 4 project initialized
    • shadcn-nuxt and Tailwind CSS configured
    • TypeScript strict mode enabled
    • ESLint and Prettier configured
    • Basic project structure created
    • Development server tested successfully
  • Phase 2 - Database (2025-10-30)
    • Drizzle ORM installed and configured
    • All 6 database tables defined (users, products, carts, cart_items, orders, order_items)
    • Relations configured correctly
    • Initial migration generated and applied successfully
    • Database connection utility created
    • CRUD operations tested and verified
    • Drizzle Studio setup and working
    • Comprehensive schema documentation added

📊 Phase Details

Phase 1: Foundation (Nuxt 4 Setup)

Status: Done | Progress: 9/10 (90%)

Tasks:

  • Initialize Nuxt 4 project with pnpm
  • Install shadcn-nuxt module
  • Configure Tailwind CSS v4
  • Setup TypeScript strict mode
  • Configure ESLint + Prettier
  • Setup Git hooks (⏭️ Skipped - deferred to Phase 11)
  • Create basic folder structure
  • Configure nuxt.config.ts
  • Create basic layout components
  • Test development server

Note: Docker services not started (requires manual action). All other tasks completed successfully.

Details: tasks/01-foundation.md


Phase 2: Database (Drizzle ORM)

Status: Done | Progress: 12/12 (100%)

Tasks:

  • Install Drizzle ORM & PostgreSQL driver
  • Configure drizzle.config.ts
  • Create users table schema
  • Create products table schema
  • Create carts & cart_items schema
  • Create orders & order_items schema
  • Generate initial migration
  • Apply migrations to dev DB
  • Create database connection utility
  • Test CRUD operations
  • Setup Drizzle Studio
  • Document schema decisions

Completed: 2025-10-30

Details: tasks/02-database.md


Phase 3: Authentication (Cidaas OAuth2)

Status: Todo | Progress: 0/18 (0%)

Tasks:

  • Install nuxt-auth-utils + jose
  • Create PKCE generator utility
  • Create Cidaas API client
  • Create JWT validation utility
  • Implement /api/auth/login endpoint
  • Implement /api/auth/callback endpoint
  • Implement /api/auth/register endpoint
  • Implement /api/auth/logout endpoint
  • Implement /api/auth/me endpoint
  • Create useAuth composable
  • Create LoginForm component
  • Create RegisterForm component
  • Create auth page with tabs
  • Create auth middleware
  • Create rate-limit middleware
  • Test OAuth2 flow end-to-end
  • Test session management
  • Document authentication flow

Details: tasks/03-authentication.md


Phase 4: Products (Display & List)

Status: Todo | Progress: 0/10 (0%)

Tasks:

  • Create /api/products/index.get.ts endpoint
  • Create /api/products/[id].get.ts endpoint
  • Create ProductCard component
  • Create ProductList component
  • Create ProductDetail page
  • Create products index page
  • Add product images handling
  • Test product display
  • Optimize product queries
  • Document product schema

Details: tasks/04-products.md


Phase 5: Cart (Shopping Cart)

Status: Todo | Progress: 0/12 (0%)

Tasks:

  • Create /api/cart/index.get.ts endpoint
  • Create /api/cart/items.post.ts endpoint
  • Create /api/cart/items/[id].patch.ts endpoint
  • Create /api/cart/items/[id].delete.ts endpoint
  • Create useCart composable
  • Create CartItem component
  • Create CartSummary component
  • Create cart page
  • Test cart operations
  • Add cart persistence
  • Optimize cart queries
  • Document cart logic

Details: tasks/05-cart.md


Phase 6: Checkout (Forms & Flow)

Status: Todo | Progress: 0/15 (0%)

Tasks:

  • Create checkout schema (Zod)
  • Create CheckoutForm component
  • Create AddressForm component
  • Implement address pre-fill from user profile
  • Create /api/checkout/validate endpoint
  • Create checkout page
  • Implement save address to profile
  • Add form validation (VeeValidate)
  • Test checkout flow
  • Test address save/load
  • Add error handling
  • Optimize checkout UX
  • Add loading states
  • Test mobile checkout
  • Document checkout logic

Details: tasks/06-checkout.md


Phase 7: Payment (PayPal Integration)

Status: Todo | Progress: 0/12 (0%)

Tasks:

  • Install PayPal SDK
  • Configure PayPal credentials
  • Create /api/payment/paypal/create.post.ts endpoint
  • Create /api/payment/paypal/capture.post.ts endpoint
  • Create /api/payment/paypal/webhook.post.ts endpoint
  • Integrate PayPal button on checkout
  • Implement payment success flow
  • Implement payment error handling
  • Test PayPal sandbox
  • Add payment status tracking
  • Document PayPal integration
  • Test webhook handling

Details: tasks/07-payment.md


Phase 8: Order Processing (BullMQ + X-API)

Status: Todo | Progress: 0/15 (0%)

Tasks:

  • Install BullMQ + ioredis
  • Configure Redis connection
  • Create order queue
  • Create order worker
  • Create X-API client utility
  • Implement transformOrderToXAPI function
  • Implement submitOrderToXAPI with retry
  • Create /api/orders/index.post.ts endpoint
  • Create /api/orders/[id].get.ts endpoint
  • Test queue processing
  • Test X-API submission (mock)
  • Add error handling & logging
  • Setup BullBoard dashboard
  • Test retry logic
  • Document order processing

Details: tasks/08-order-processing.md


Phase 9: ERP Integration (NAV Product Sync)

Status: Todo | Progress: 0/10 (0%)

Tasks:

  • Create NAV ERP product schema (Zod)
  • Create /api/erp/products.post.ts endpoint
  • Implement API key authentication
  • Implement product validation
  • Implement product upsert logic
  • Add error handling & logging
  • Test product sync (mock data)
  • Test API key auth
  • Add rate limiting
  • Document ERP integration

Details: tasks/09-erp-integration.md


Phase 10: i18n (Internationalization)

Status: Todo | Progress: 0/8 (0%)

Tasks:

  • Install @nuxtjs/i18n
  • Configure i18n module
  • Create locale files (de-DE.json, en-US.json)
  • Translate all UI strings
  • Create language switcher component
  • Test route localization
  • Test currency/date formatting
  • Document i18n structure

Details: tasks/10-i18n.md


Phase 11: Testing & Deployment

Status: Todo | Progress: 0/15 (0%)

Tasks:

  • Setup Vitest for unit tests
  • Write tests for auth utilities
  • Write tests for API endpoints
  • Setup Playwright for E2E
  • Write E2E test: user registration
  • Write E2E test: complete checkout flow
  • Create Dockerfile (production)
  • Create docker-compose.yml (production)
  • Configure GitLab CI/CD
  • Test production build
  • Setup staging environment
  • Deploy to staging
  • Final QA on staging
  • Document deployment process
  • Deploy to production 🚀

Details: tasks/11-testing-deployment.md


📈 Progress Over Time

Date Overall Progress Phase Notes
2025-01-29 0% Planning Task system created
2025-10-29 6.6% Phase 1 - MVP Foundation completed: Nuxt 4, shadcn-nuxt, Tailwind CSS, ESLint, Prettier all configured
2025-10-30 15.3% Phase 2 - MVP Database completed: Drizzle ORM, all tables defined, migrations applied, Studio working, schema documented

🎉 Next Steps

  1. Start Phase 3: Authentication (Cidaas OAuth2)
    • Read tasks/03-authentication.md for detailed tasks
    • Review docs/CIDAAS_INTEGRATION.md for complete OAuth2 implementation guide
    • Install nuxt-auth-utils and jose packages
    • Implement PKCE generator utility
    • Create Cidaas API client
    • Build OAuth2 login/callback/register/logout endpoints
    • Create auth UI components (LoginForm, RegisterForm)
    • Implement auth middleware for protected routes
    • Test complete OAuth2 flow end-to-end

Let's build this! 🚀